• slidebg1
    BNK Power Solutions
    O&M IN THERMAL POWER PLANT
    Power sector is one of the fastest growing sectors in India,
    which certainly supports the economic growth.
    We Provide Operation & Maintance services IN THERMAL POWER PLANT.
BNK Power Solutions Pvt. Ltd.                                            Commitment Leads to Miracle………   Contact Us!

OUR VISION

Our vision is to become the world leader of operation and maintenance (O&M) services in India, while building a robust system which optimizes the generation with least cost; a system which is reliable and environmentally friendly.

OUR MISSION

To accomplish our goals we have a mindset for: Providing quality services in an efficient and professional manner to ensure optimum production, safety and minimizing negative impacts on the environment. We combine technical expertise & a team of highly skilled workforce to provide life cycle power solutions, optimizing plant performance and enhancing our customer’s progress

WHY BNK POWER SOLUTIONS SHOULD
GET BUSSINESS IN YOUR ESTEEM ORGANISATION!!

WE SURELY DESERVE TO BECOME YOUR BUSINESS ASSOCIATES AS WE HAVE INTENSE CONVICTION TO ENHANCE THE PROFITABILITY OF PLANT BY THE FOLLOWING MEANS

  • OPTIMIZATION OF MANPOWER
  • REDUCTION OF AUXIALLRY POWER CONSUMPTION BY 2%
  • REDUCTION IN STATION HEAT RATE BY 5-10 %
  • ZERO ACCIDENT WILL BE ACHIEVED
  • PLANT AVAILABILITY WILL BE INCREASED BY 99%
  • INVENTORY MANAGEMENT, REDUCTION 10% IN INVENTORY COST .
  • USAGE OF BIOMASS N LOW GRADE FUEL TO REDUCE FUEL COST SUBSTANTIALLY.
  • BY ABOVE MEANS WE SURELY ACHIEVE APPROX 20% REDUCTION IN OPERATIONAL COST.

SIGNIFICANT ACHIEVEMENTS BY OUR CORE TEAM MEMBERS

  • Conceptualization To Implementation Of 100% Pith Burning (1.5 Lacs Ton),Saving Of 25 Crores Per Annum

  • Saving Of Rs 10 Crores Through Kaizen

  • Elimination Of Scale Formation In Steam Turbines (Saving-4 Crores Per Annum)

  • Major Modifications Of Ash Handling System Of Boilers For Uses Of Washery Reject Coal To Reduce The Fuel Cost For Power Generation.

  • Received The Best Energy Efficient Award By CII & BEE

  • Successfully Reduced The Un-Burnt Carbon Percentage In Fly Ash From 12% To 4%

  • Commissioned 1x80 Mw Bhel Make Steam Turbine And 1x336 Tph Thyssenkrupp Make Cfbc Boiler In Scheduled Time.

  • Improved The Cooling Water Quality By Installation Of Side Stream Filter To Improve The Turbine Efficiency.

  • APPLICATION OF MODERN OPERATION TECHNIQUES

    THE ORGANIZATION, IN ORDER TO SUSTAIN & THEN GROW IN A COMPETITIVE MARKET, MUST CONTINUOUSLY IMPROVE QUALITY AND REDUCE COST BY FINDING HIGH COST/INEFFICIENT OPERATIONS, NINE VALUES ADDED ACTIVITIES AND REWORK AND REJECTION. THE ORGANIZATION MUST ADOPT LATEST TOOLS AND TECHNIQUES TO OPTIMIZE THE OPERATION OF THE PLANT



    • SYSTEMATIC PROBLEM SOLVING + 7 QC TOOLS

    • QUALITY CIRCLES

    • 5-S FOR GOOD WORKPLACE ORGANIZATION

    • SMED FOR SETUP TIME REDUCTION

    • MUDA (WASTE) ELIMINATION
    • STATISTICAL PROCESS CONTROL (SPC)

    • SIX SIGMA

    • JUST-IN-TIME (JIT)
    • KAIZEN (FOR CONTINUOUS IMPROVEMENT)

    • BENCHMARKING

    • TOTAL PRODUCTIVE MAINTENANCE (TQM)
    ENERGY CONSERVATION Energy Dominates As A Key Role In Achieving The Desired Economic Growth. Efficient Utilization Of Energy Resource Is Not Only Conservational But Also Saves Capital Investment. The Conservation Is Indeed The Cheapest Of Energy ‘resource’ At Least Until Its Potential Is Exhausted. We Have Also Achieved Several Milestones In This Field By VFD Installation, Impeller Trimming, Reducing The Operational Hours Of Machine, Optimization Of Capacity Utilization, Changing In Operational Parameters, Elimination Of Double Handling, Proper Insulation Etc.

    WE HAVE SAVED APPROX 4000 KW / HR

    GALAXY OF STARS ON BOARD

    • Mr. OP SHRIVASTAV

      G.M., Electrical , BHEL                         

    • <
    • Mr. V.K. TRIPATHI

      H.O.D. (E&I), Phoenix Pulp & Paper Mill, Thailand                         

    • Mr. S. L. GOEL

      SR. G.M. (Electrical), Century Pulp & Paper                         

    • Mr. S. S. RAWAT

      Sr. D.G.M., Monnet Ispat & Energy Ltd (170 MW Thermal Power Plant) – Raigarh

    • Mr. P. K. SRIVASTAVA

      Chief Engineer (O&M) – Sanjay Gandhi Thermal Power (1200 MW)

    • Mr. YOGENDRA SINGH

      G.M. (Energy Conservation), West Coast Paper Mill, Karnataka

    • Mr. R. K. SRIVATAVA

      Chief Chemist – 450 MW Amarkantak Thermal Power Plant, Anuppur (M.P.)

    • Mr. K. V. SINGH

      Chief Engineer (Electrical), 320 MW -Sarni Thermal Power Plant,(M.P.)

    • Mr. U. P. Sharma

      Electrical Head - BLA Power Gadarwara (MP), Sr. Engineer (Electrical) - 450 MW -Amarkantak Thermal Power Plant, Anuppur (M.P.)

    • Mr. O. P. Yadav

      Mechanical Head (Power Plant), Century Pulp & Paper Lalkuan, Uttarakhand.

    • Mr. Vinod Kumar Pidiha

      Sr. Engineer (O&M), 450 MW Amarkantak Thermal Power Plant, Anuppur (M.P.)

    • Mr. A. K. Pathak

      Additional General Manager, having experience in 50 MW DG- Set Operation in JP Group

    MAJOR MODIFICATIONS/ ALTERATIONS

    • RETRO FITTING OF STOKER FIRED BOILER INTO AFBC BOILER
    • MODIFICATION OF AFBC BOILERS TO ACCOMMODATE BIOMASS
    • MAJOR MODIFICATION OF BOILERS (COST-RS 6 CRORES) TO ENHANCE THE PLANT AVAIBILITY AND EFFICIENCY