Significant Achievements By Our Core Teammembers

Conceptualization to implementation of 100% pith burning (1.0 lakh ton approx.), saving of 20 Crore per annum.
Elimination of scale formation in steam turbines (saving- 4 crore per annum).

Saving up to Rs. 100 Crore through "KAIZEN".
Increase the plant load factor from 80 % to 99%.
Received the best energy efficient award by CII & BEE.
Major modifications of ash handling system of boilers for uses of the washery reject coal to reduce the fuel cost of power generation.
Commissioned 1x80 MW BHEL make steam turbine and 1x336 TPH THYSSENKRUPP make CFBC boiler in scheduled time.
Successfully reduced the un-burnt carbon percentage in fly ash from 12% to 2.5%.
Improved the cooling water quality by installation of side stream filter to improve the turbine efficiency.